This project generally consists of the extension of the sanitary sewer line from Manhole No. 73 to existing
airport terminal pump station. This improvement will convert the airport sanitary sewer system from local
sanitary sewer drain field system to gravity fed municipality sewer system. Grading and Rock Excavation will
be required on the project for the installation of the sewer line.