On 1/25/2022 Collection crews received a call from a contractor working at North Paulding High School who indicated there may be a problem with the lift station. Crews arrived at 3:43 p.m. and discovered that the power was out to the station. Power crews were called to re-establish power service and the station was restored to normal operation by 5:00 p.m. It is estimated that 4000 gallons of sewage escaped the wet well, went onto the ground and eventually went into Ward creek. The site was cleaned up and signs were placed at the creek.